PMG logo

Lot 4. Left-Bank Structures

Lot 4 covers key left-bank hydraulic and underground infrastructure linked to electricity generation and water conveyance. The scope includes permanent water intake systems, pressure shafts, penstocks, underground powerhouse caverns, transformer facilities, and associated operational infrastructure. This package connects the hydraulic system with the underground powerhouse and supports continuous and efficient plant operation.