Lot 2 covers the core civil engineering works for the construction of the Rogun main dam and associated foundation treatment measures. The scope includes staged dam construction, foundation strengthening, and technical measures to ensure structural stability, water tightness, and long-term performance under complex hydraulic and geological loads. Lot 2 forms the structural foundation of the overall hydropower system and reservoir development.