PROJECT MANAGEMENT GROUP FOR ENERGY FACILITIES CONSTRUCTION
UNDER THE PRESIDENT OF THE REPUBLIC OF TAJIKISTAN
Pre-Qualification Document for Procurement of Works LOT 3A -Right Bank Structures of rogun hydroelectric power plant using world bank standard procurement document, request for bids (works), two envelopes with rated criteria, march 2025
Pre-Qualification Document for Procurement of Works
LOT 3A -Right Bank Structures of rogun hydroelectric power plant using world bank standard procurement document, request for bids (works), two envelopes with rated criteria,
march 2025
link: https://drive.google.com/file/d/1Unc6pvC4xyJFLoCtL4yT4dFsQjUaGO9W/view?usp=sharing